Project Description

This bridge preservation project is part of the State Bridge Unit: Bridge Painting Quality Assurance for the NC Department of Transportation (NCDOT) in Division 4. The project included painting and blasting four structures ranging from four spans to eight spans throughout Smithfield, North Carolina.

Our Industrial Coatings team provided inspection and documentation duties, monitored traffic control, monitored abrasive blasting, measured the surface profile of the blasted surface, monitored the ambient weather conditions, and observed the mixing of the paint components. We also witnessed the application of each coat on the structures and determined and recorded the dry film thickness. Our team ensured all applicable specifications and directives were complied with, and we monitored the removal of hazardous blast media and lead paint waste.

Project Details

Project Size

4 Bridges

Project Location

Smithfield, NC

Project Type

Bridges
Roads/Highways

Related Projects

B-4962 Bridge 046 Replacement

Hillsborough, North Carolina

Bridge over French Broad River (B-5992)

Alexander, North Carolina

Earl M. Vickers Bridge Rehabilitation

Fayette and Kanawha Counties, West Virginia