Project Description

Summit developed and led Engineering for Plans for the widening and realignment of US 158 in Northampton County. This 8.5-mile project with 21% trucks included interchanges with I-95 and US 301. The design consisted of widening the two and three-lane sections of the roadway to a four-lane divided freeway, typically with a total of four roundabouts on the project. Some sections were designed as Controlled Access, while others had Limited Access with a Superstreet design.

Summit was responsible for Roadway Design, Traffic Management, and Erosion Control plans for the project. After the project, Summit continued to assist NCDOT with Design and Construction revisions for all disciplines of design.

Project Details

Project Size

Varies by Task Order

Project Location

Northampton County, NC

Project Type

Roads/Highways
Municipal

Related Projects

Capitol Blvd Superelevation Improvements

Wake County, North Carolina

Highway 55 Turn Lane Addition

Holly Springs, North Carolina

NC Highway 66 Widening (U-5824)

Walkertown, North Carolina